|
POST INSTALLATION

Step 1: Set all stainless Universal Termination Posts
UTP39 vertically at their location.
Note: Make sure that all the Termination Posts UTP39 that
have an extra set of holes drilled for the Lock T Terminals
LTHS249 are set in the correct position. Remember the lock
T side has holes drilled on one side of the post ONLY.
Step 2: Mark center of all flange holes. Remove post.
Step 3: Pre- drill 15/64" pilot holes. (Drill
½" if using Red Head Anchors in Concrete)
Step 4: Set post and shim the post plumb if needed.
Step 5: Insert lag bolts SLB325 with flat washers
LBW25 and lock washers LBLW25 into pilot holes
Step 6: Tighten all lag bolts until post is tight
to the deck. Blocking must be installed at all lag bolt locations.
Step 7: Set string line on outside face of termination
posts.
Step 8: Set all stainless Universal Intermediate Posts
UIP39 on string line and equal post spacing for that run.
Repeat Steps 1-6 for the rest of your runs.
.....................................................
SRS Installation Instructions
.....................................................
TOP RAIL INSTALLATION
Step 1: Insert and pop rivet fast all transformer
caps at their pre - determined location. Insert Intermediate
Post Shims IPS180 in intermediate posts only.
Use a 3/16" bit to drill the pilot hole on the top of
the posts and through the transformer caps on BOTH sides.
Note: Tape transformer caps in place with blue masking tape.
Remember drill SLOW at MEDIUM pressure for stainless.
Insert BOTH pop rivets in the drilled holes. Pop the rivets
into the posts with the supplied SCS pop rivet gun. Note:
Make sure that BOTH rivets are in place before pop riveting
the transformer cap in place. The other rivet captures that
side and insures that the cap will stay flush with the top
of the posts. If you do not capture both sides with the pop
rivets you will cock the transformer cap when riveting one
side.
Step 2: Measure and purchase the correct amount of
5/4"(1") X 6" wood top rail at your location.
Step 2B: If you are using SRS skins purchase 5/4"
X 4" pre- primed finger jointed pine for the wood core.
Slip the wood core inside of skins. WEAR GLOVES THE SHEET
METAL CAN BE SHARP! Miter all corners and butt all joints
on top and center of intermediate posts. A small bead of silicone
should be applied on all butt joints.
Step 3: Set table saw fence to the width of the stainless
posts (2 "). (Set a post in table saw and slide fence
tight.)
Step 4: Rip a 2" block out of the 5/4" (1")
X 6" (5 1/2") board. (The 3.5"board will be
your top rail or wood core and your 2" piece will be
the blocking.)
Step 5: Router all outside edges of the 3.5"top
rail and 2" blocking with 1/8" round over bit.
Step 6: Measure, cut and set blocking underneath transformer
caps and mark outside edges of transformer caps fastening
Ts on top of blocking.
Step 7: Router out a 1/8" deep channel to accept
the transformer caps mounting Ts. Router along lines marked
from transformer caps. The transformer caps fastening T's
are 1/8" thick. This insures that the blocking lays flat
on the bottom of the top rail. Also, drill a small 3/8"
hole in the end of the blocking so blocking fits flush to
the posts and the pop rivet PR316 will slip inside this hole.
Step 8: Set all blocking in between all posts. Insure
all blocking is flush with outside edges of posts. Drill a
1/8" hole down through the transformer cap hole and through
the blocking. This will indicate where you need to screw fast
the top rail from underneath.
Step 9: Measure, cut and set top rail on top of posts
and transformer caps. Miter all corners. Make sure your reveal
is even on both sides of railing. Screw fast the 3 1/2"
top rail through the pre drilled holes in the blocking from
underneath with the Transformer Top Rail Screw TTRS50.
Step 10: Continue to screw fast top rail from underneath
through blocking. Stagger the screws approximately one every
foot of hand rai.
.....................................................
INSTALL CABLE ASSEMBLIES:
Step 1: Unroll cable assemblies and set by each appropriate
run.
Step 2: Slide all the cables through the appropriate
holes on the stainless posts until termination fitting bottoms
out.
Step 3: If hand swaging the last fitting follow the
instructions included with the SRS tools. HSTT
Instructions. If you are using the Lock T Hand Swage Terminals
LTHS249 hand swage three times. See LTHS249 instructions with
SCS rental tools.
Step 4: Insert tensioning fitting on opposite termination
post.
Step 5: Tension all cable strands to 300 lbs per strand.
Start from the middle and work out back and forth to top and
bottom of the post.
Step 6: After all cables are tensioned to 300 lbs
per strand install a sacrificial nut (double nut) on all tensioning
terminals. *Tighten with a 10 mm wrench to insure that the
nut will not spin off.
Step 7: Cut off excess bolt with 1/8" cut of
disc on a 4" grinder. *You may use any type of metal
cutting devise that you see fit. PLEASE wear safety glasses!
Step 8: Remove burrs from tensioning terminal bolt
with bastard file. Then remove the sacrificial nuts.
Step 9: Install stainless acorn nuts and tighten with
11 mm wrench.
Step 10: Enjoy!
[ Top
]
|